FROST ENGINEERING is one of the contracted companies to review, analyze and determine the condition of toll road bridges and propose plans to repair each bridge on the Indiana Toll Road.
What does an INDIANA TOLL ROAD bridge inspection comprise of?
Bridge analysis of every bridge that must be completed every two years in accordance with the National Bridge Inspection Standards
Bridge repair plans according to the priority level indicated
ITR is a toll road that streches 157miles from the Illinois border to the Ohio border which contains a total of 21 interchanges
Why did this occur?
In 1951, the Indiana General Assembly passed legislation creating the Indiana Toll Road Commission. The toll road opened in late 1956. In 1985, legislation authorized the Toll Finance Authority to enter into contracts or leases with the Department of Highways (now INDOT) for the operation of all toll road and toll bridge projects.
What do they do?
Oversee ITR (I-80/90) operations & projects
On January 23, 2006 Statewide Mobility Partners LLC (SMP) formed the ITR Concession Company LLC to operate and manage the ITR. On June 29, 2006 ITRCC then assumed full operating and maintainence responsbilities of the Indiana Toll Road.
ITR Concession Company has currently invested nearly $300 million in road improvements and has committed to investing an additional $300 million in improvements over the next 7 yrs
Frost Engineering was selected to inspect all of the ITR bridges from Chicago to the border of Ohio. Once these are inspected, project plans are submitted for bid and construction.